Treadwell gold mine Wikipedia
By 1882, a 5stamp mill was operating. In 1887, a 120stamp mill was erected, which was doubled in size the next year. Between 1883 and 1896, three more mills were added. These were for the Mexican, Seven Hundred Feet, and Ready Bullion mines, while the Treadwell Mine had its own 300stamp mill.